Grange Cohan is a 68no unit estate based in Waterford City, consisting of 62no houses and 6no. apartments. There is also a creche facility on site as well as an office which is used by Focus. There is a second office within the apartment block which is used mainly for meetings.

The average pre works building energy rating (BER) was a D2, the average post works BER is a B2 with the average uplift of over 153kWh per unit.

Upgrade measures to houses and apartments included:

Attic Insulation and roof ventilation,
Wall insulation-cavities pumped. Background & permanent ventilation installed where required.
Full windows & doors replacement throughout
Installation of new air to water heat pump
Installation of solid fuel stoves
LED lightbulbs & Energy Monitor
Pre & Post BERS

Upgrade measures to creche and office facility included:

LED Lighting
New air to water heat pump installed in the main office
New air to air heat unit installed to the office in apartment block.



Cluid-Glendallon

Kingdom Installation

Glendallon consists of 57no houses and is located in Ballytivnan, Sligo. The average pre works building energy rating (BER) was a D2 the average post works BER is a B2, with the average uplift of over 155kWh per unit. The dwellings had previously upgraded the insulation to the attic and had the walls pumped.

Upgrade measures carried out under Kingdom Installation remit included:

Full windows & doors replacement throughout
Installation of new air to water heat pump
Installation of solid fuel stoves
LED lightbulbs & Energy Monitors
Pre & Post BERS



Cluid-Highfields Ballyshannon

Kingdom Installation

Highfield Ballyshannon is a 19no house estate in Co. Donegal The average pre works building energy rating (BER) was a C3, the average post works BER is a B1, with the average uplift of over 125kWh per unit.

Upgrade measures included:

Full windows & doors replacement throughout
Installation of new air to water heat pump
Installation of solid fuel stoves
LED lightbulbs & Energy Monitor
Pre & Post BERS



Cluid-Camcor Park

Kingdom Installation

Camcor Park, Birr, Co. Offaly consists of 26no houses and 13no. apartments. The landlord areas of the apartment block was also included in the project as well as a creche facility. The average pre works building energy rating (BER) was a D1, the average post works BER is a A3, with the average uplift of over 175kWh per unit.

Upgrade measures included:

Houses:

Installation of new Air to Water Heat Pump
Installation of solid fuel stove
Window and door replacement
LED lightbulbs & Energy Monitors
Pre & Post BERS

Apartments:

Installation of new Air to Water Heat Pump
Window replacement
LED lightbulbs & Energy Monitors
Pre & Post BERS

Landlord Areas:

LED Lighting
Full window and door replacement
Heating upgrade-storage heaters replaced with radiators

Creche:

LED Lighting
Full window and door replacement
Installation of new air to water heat pump



Respond-Tara Crescent

Kingdom Installation

Tara Crescent is a 54no unit estate based in Tullamore, Co. Offaly consisting of 38no houses and 16no apartments. There is also a community building on site where upgrades were also undertaken. The average pre works building energy rating (BER) was a D2, the average post works BER is a B1, with the average uplift of over 198kWh per unit.

Upgrade measures to houses and apartments included:

Installation of new Air to Water Heat Pump
Installation of solid fuel stove
Full window and door replacement
LED lightbulbs and Energy Monitors
Pre & Post BERS

Upgrade measures to the community building included:

Wall insulation (cavity pumped)
Attic Insulation
Full window and door replacement
Installation of new Air to Water Heat Pump
Replacement of existing light fittings to LED fittings



Respond-Fairgreen

Kingdom Installation

Fairgreen is a 24no unit estate based in Edenderry, Co. Offaly consisting of 20no houses and 4no apartments. There is also a community building on site where upgrades were also undertaken. The average pre works building energy rating (BER) was a D2, the average post works BER is a A3, with the average uplift of over 184kWh per unit.

Upgrade measures to houses and apartments included:

Installation of new Air to Water Heat Pump
Installation of solid fuel stove
Full window and door replacement
LED lightbulbs and Energy Monitors
Pre & Post BERS

Upgrade measures to the community building included:

Wall insulation (cavity pumped)
Attic Insulation
Full window and door replacement
Installation of new Air to Water Heat Pump
Replacement of existing light fittings to LED fittings



Respond-Kilcronan Court

Kingdom Installation

Kilcronan Court is a estate in Dublin. The project included the upgrade of 34no houses and a community building. The average pre works building energy rating (BER) was a D1, the average post works BER is a A3, with the average uplift of over 167kWh per unit.

Upgrade measures to houses and apartments included:

Roof Insulation
Cavity Wall Insulation
Installation of new Air to Water Heat Pump
Full window and door replacement


Upgrade measures to the community building included:

Wall insulation (cavity pumped)
Attic Insulation
Full window and door replacement
Installation of new Air to Water Heat Pump
Replacement of existing light fittings to LED fittings